The site survey that prevents rework
3 min read

Measuring twice is cheaper than cutting twice. What our team records before a single section is cut.
Before fabrication starts we record the clear opening, level differences, plumb of the surrounding structure, fixing substrate and access route to the position.
Openings in real buildings are rarely perfectly square. Recording the actual variation lets us build in adjustment where it will not be seen, rather than forcing a fit on site.
Access is checked too: a perfectly fabricated assembly is of no use if it cannot be carried to where it is needed.